The Challenge of the Construction Sites
Direct city water is out of reach for many construction sites, making it challenging to provide clean, safe drinking water for workers. That’s precisely what Fulton Hogan faced when managing a critical road bypass in a remote location. With workers spending significant time traveling to and from the main base, Fulton Hogan was looking for a solution to reduce travel time and improve working conditions.
The Solution
We provided clean, safe drinking water in remote locations with the CHILLED WATER TRAILER. This innovative remote water solution provided 300 liters (80 gallons) of potable water through a refillable water keg system, with no power required.
Key features of the hydration station trailer include:
- 50″ LED screen technology for displaying safety messages and communication
- LED lighting
- Solar power technology
- Optional chilled water
According to Fulton Hogan, the WALLOP WATER Trailer was a game-changer for their construction site.
We conducted a motion and time study and identified a reduction in costs and waste, improved working conditions, and motivated people through the Remote WALLOP WATER Trailer deployment,” said Site Manager John Smith. “We even provided free refillable drinking vessels for all our staff.”
If you’re managing a construction site in a remote location and in need of a reliable water solution, consider the WALLOP WATER Trailer. Contact us today to learn more.