- Client: Hoffman Construction
- Project Scope: Leading Semiconductor R&D Facility – Delivery and Installation of Phase One Hydration – A 3-Year Construction Sustainability Initiative
- Location: Sunnyvale, California
- Industry: Construction
Overview
In collaboration with WALLOP WATER Australia, WALLP WATER USA achieved a monumental milestone by successfully implementing Phase One of a comprehensive sustainability-focused project. This $4 billion venture aims to build the world’s largest and most advanced facility for collaborative semiconductor process technology and manufacturing equipment R&D.
Challenge
A project of this scale presented unique challenges:
- Environmental Responsibility: Reducing the environmental footprint during a multi-year construction phase.
- Sustainability Goals: Complete eradication of single-use plastic bottles to align with sustainability KPIs.
- Hydration Accessibility: Ensuring hundreds of workers have seamless access to clean, filtered water.
Solution
WALLOP WATER implemented its flagship solutions, including:
- Wallop Water Monster Bars: High-capacity hydration stations delivering chilled, filtered water.
- Custom Installation: Strategically placed systems across the 3-year construction site to maximize efficiency and access.
- Onsite Support: Maintenance teams ensure uninterrupted service during peak construction.
Impact
- To eliminate 1.5 million single-use plastic bottles during Phase One.
- Aligned the client’s operations with global sustainability standards.
- Enhanced worker satisfaction and hydration on-site, leading to improved productivity.
Looking Ahead
As Phase Two begins, WALLOP WATER remains committed to driving sustainability innovations to support the successful completion of this groundbreaking project with our Trailer Bar 2.0.